Case Studies

Case Study

Aibel – Innovative double redundancy fail-safe system for oil rig

Tasked with designing a revolutionary control system for a crane on board the Johan Sverdrup platform being built by Aibel, Norway, Banelec’s vast experience in hazardous area systems was called to the test.

Case Study

Eilbeck Cranes – Fast turnaround on size restricted systems

Banelec have provided solutions for multiple projects for Eilbeck Cranes, this example being the most prominent for showcasing what we are capable of.